![]() |
MOQ: | 1 Piece |
Price: | Negotiation |
Delivery Period: | 7-30 days |
Payment Method: | L/C, T/T, Western Union |
Handwheel Operated Globe Valve Double Flange End Non Return CF8 CF3 WCB
Specifications
- Design Standard:GB/T2224-2005
- Inspection & Test: JB/T9092-1999
- Face To Face: GB/T12221-2005
- Pressure testing: GB/T13927-1992
Application
The opening and closing member of the national standard stop valve (throttle valve) is a cylindrical valve flap with a flat or conical surface, and the valve disc moves linearly along the center line of the fluid. The national standard stop valve is only suitable for full opening and full closing. It is generally not used to regulate the flow. It is allowed to adjust and throttle when customized.
DN | L | D | D1 | D2 | b | Z-φd | H | D0 |
15 | 130 | 95 | 65 | 46 | 14 | 4-14 | 188 | 140 |
20 | 150 | 105 | 75 | 56 | 16 | 4-16 | 188 | 140 |
25 | 160 | 115 | 85 | 65 | 16 | 4-16 | 212 | 140 |
32 | 190 | 135 | 110 | 78 | 18 | 4-18 | 285 | 160 |
40 | 200 | 150 | 110 | 84 | 18 | 4-18 | 246 | 160 |
50 | 230 | 165 | 125 | 99 | 20 | 4-20 | 252 | 200 |
65 | 290 | 185 | 145 | 115 | 20 | 4-20 | 308 | 200 |
80 | 310 | 200 | 160 | 132 | 22 | 8-20 | 327 | 250 |
100 | 350 | 220 | 180 | 155 | 22 | 8-22 | 384 | 250 |
125 | 400 | 250 | 210 | 184 | 22 | 8-22 | 484 | 300 |
150 | 480 | 285 | 240 | 211 | 24 | 8-24 | 547 | 350 |
200 | 600 | 340 | 295 | 265 | 24 | 12-24 | 660 | 350 |
Feature
1. Advanced structure, reliable sealing, excellent performance and beautiful appearance. The steel of the valve stem is increased, the noise and vibration are significantly reduced, and the service life and performance of the valve are improved.
2. The shut-off valve can be installed at any position of the pipe, and the medium flows from the bottom to the top.
3. DN250 or above adopts advanced multi-sealing, double brackets, adopts guiding motion (which can greatly improve the impact resistance against water hammer), and the medium enters from above. It better solves the large opening and closing torque of the large-diameter globe valve, and the seal cannot be closed. The filling chamber runs, which greatly improves the performance and scope of the valve. (The torque of "off" is 10% of the "open" of the ordinary valve is 3% of the ordinary valve).
Package&Delivery
Packing Details: We choose suitable wood cases according to different valves and arrange skilled workers to pack in case of bruise. Long term cooperated forwarder will book space, clear customs and transport for us without delay. There are three ways for transportation, by sea, by air and by train. We will arrange transportation according to customers' needs.
Delivery Details: according to the order, 7~60days
FAQ
Q: Are you trading company or manufacturer ?
A: We are a factory.
Q: How long is your delivery time?
A: According to the order,7~60days.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
![]() |
MOQ: | 1 Piece |
Price: | Negotiation |
Delivery Period: | 7-30 days |
Payment Method: | L/C, T/T, Western Union |
Handwheel Operated Globe Valve Double Flange End Non Return CF8 CF3 WCB
Specifications
- Design Standard:GB/T2224-2005
- Inspection & Test: JB/T9092-1999
- Face To Face: GB/T12221-2005
- Pressure testing: GB/T13927-1992
Application
The opening and closing member of the national standard stop valve (throttle valve) is a cylindrical valve flap with a flat or conical surface, and the valve disc moves linearly along the center line of the fluid. The national standard stop valve is only suitable for full opening and full closing. It is generally not used to regulate the flow. It is allowed to adjust and throttle when customized.
DN | L | D | D1 | D2 | b | Z-φd | H | D0 |
15 | 130 | 95 | 65 | 46 | 14 | 4-14 | 188 | 140 |
20 | 150 | 105 | 75 | 56 | 16 | 4-16 | 188 | 140 |
25 | 160 | 115 | 85 | 65 | 16 | 4-16 | 212 | 140 |
32 | 190 | 135 | 110 | 78 | 18 | 4-18 | 285 | 160 |
40 | 200 | 150 | 110 | 84 | 18 | 4-18 | 246 | 160 |
50 | 230 | 165 | 125 | 99 | 20 | 4-20 | 252 | 200 |
65 | 290 | 185 | 145 | 115 | 20 | 4-20 | 308 | 200 |
80 | 310 | 200 | 160 | 132 | 22 | 8-20 | 327 | 250 |
100 | 350 | 220 | 180 | 155 | 22 | 8-22 | 384 | 250 |
125 | 400 | 250 | 210 | 184 | 22 | 8-22 | 484 | 300 |
150 | 480 | 285 | 240 | 211 | 24 | 8-24 | 547 | 350 |
200 | 600 | 340 | 295 | 265 | 24 | 12-24 | 660 | 350 |
Feature
1. Advanced structure, reliable sealing, excellent performance and beautiful appearance. The steel of the valve stem is increased, the noise and vibration are significantly reduced, and the service life and performance of the valve are improved.
2. The shut-off valve can be installed at any position of the pipe, and the medium flows from the bottom to the top.
3. DN250 or above adopts advanced multi-sealing, double brackets, adopts guiding motion (which can greatly improve the impact resistance against water hammer), and the medium enters from above. It better solves the large opening and closing torque of the large-diameter globe valve, and the seal cannot be closed. The filling chamber runs, which greatly improves the performance and scope of the valve. (The torque of "off" is 10% of the "open" of the ordinary valve is 3% of the ordinary valve).
Package&Delivery
Packing Details: We choose suitable wood cases according to different valves and arrange skilled workers to pack in case of bruise. Long term cooperated forwarder will book space, clear customs and transport for us without delay. There are three ways for transportation, by sea, by air and by train. We will arrange transportation according to customers' needs.
Delivery Details: according to the order, 7~60days
FAQ
Q: Are you trading company or manufacturer ?
A: We are a factory.
Q: How long is your delivery time?
A: According to the order,7~60days.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.